• About Us
  • Capabilities
  • Projects
  • Our Commitment
  • Careers
  • Contact Us
Header2.jpg
General Construction Company
  • About Us
    • Culture
    • History
    • Working with us
  • Capabilities
    • Marine
    • Industrial
    • Heavy Civil
    • Design Build
    • Equipment Fleet
  • Projects
    • Marine
    • Industrial
    • Heavy Civil
  • Our Commitment
    • Safety
    • Quality
  • Careers
  • Contact Us
Hide Search Field
Show Search Field

Oakland Bay Bridge Skyway Segment

Home    »    Projects    »    Heavy Civil    »    Bridges    »    Oakland Bay Bridge Skyway Segment

Related Projects

  • Allen Street Bridge Replacement
  • Hamilton Avenue Bascule Bridge Project
  • Benicia Segmental Bridge
  • Homer M. Hadley Bridge Repair
  • Oakland Bay Bridge E2/T1 Foundation
  • Oakland Bay Bridge Skyway Segment
  • SR520 Pontoon Construction
  • Tacoma Narrows Bridge

Back to Previous Page

View Summary List of Related Projects

Oakland Bay Bridge Skyway Segment?-?San Francisco, Calif.

  • Project started in 2002
  • Project completion 2008?
  • Project Type:?Heavy Civil?
  • Owner:?California Department of Transportation?
  • Location:?San Francisco, CA?
  • Contract Amount:?$1.2 Billion?
  • Designer:?T.Y. Lin/Moffatt & Nichol?

$1.2 billion Skyway Bridge project included the construction of a mile and a half of side-by-side viaduct bridge structures in San Francisco Bay. The contract was the first of several to replace the existing east span of the San Francisco Oakland Bay Bridge. Each structure is designed to carry five lanes of vehicular traffic and has two breakdown lanes.

General Construction was part of the KFM Joint Venture team and had major involvement in the foundation construction work. The project had numerous unprecedented construction challenges. The bridge is founded 28 piers. Each pier is supported by 8 ft diameter 320 ft long cast in steel shell piles that required some of the biggest pile driving equipment in the world to drive the 425 ton piles. The piles support one-piece 2,200 ton structural steel footing boxes that had to be set in one piece. Piers and pier tables were cast-in-place and required unique formwork and falsework to build. The precast segmental structure required the casting and erection of 452 precast concrete segments weighing up to 800 tons each.

Careers

Apply Now!

GCC is a subsidiary of Kiewit Corporation. This link will direct you to Kiewitjobs.com where you’ll find a comprehensive list of all Kiewit and subsidiary staff opportunities.?If you would like to view GCC jobs only, use the search tool to narrow results.

?
Featured Projects
Benicia-Martinez Bridge
Benicia-Martinez Bridge
Oakland, Calif.
Read More
Oakland Bay Bridge Skyway
Oakland Bay Bridge Skyway
San Francisco, Calif.
Read More
Contact GCC

Corporate Office:

33455 6th Avenue South

Federal Way, WA 98003

General Info :?info@GCC.com

Apply Now!

?

GCC is a subsidiary of Kiewit Corporation. This link will direct you to Kiewitjobs.com where you’ll find a comprehensive list of all Kiewit and subsidiary staff opportunities.?If you would like to view GCC jobs only, use the search tool to narrow results.

?

Featured Projects

Benicia-Martinez Bridge
Benicia-Martinez Bridge
Oakland, Calif.
Read More
Oakland Bay Bridge Skyway
Oakland Bay Bridge Skyway
San Francisco, Calif.
Read More

Contact GCC

Corporate Office :

?33455 6th Avenue South
Federal Way, WA 98003
Tel: (253) 943-4200
Fax: (253) 943-4021?

?

General Info :?

info@GCC.com

?
© 2021 General Construction Company. All Rights Reserved.
  • Privacy Policy
  • Terms & Conditions
  • Sitemap
  • Search
Top
Menu
韩国三级片在线观看,欧美5~12牲交,思思久久96热在精品国产,影音先锋色AV男人资源网
<蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <蜘蛛词>| <文本链> <文本链> <文本链> <文本链> <文本链> <文本链>